
Installation and Replacement 3-5
Installing The Vanguard 3400 Series
Installation Complete these steps to install the unit:
You can stack as many as three Vanguard 3400 Series units on top of each other.
Do not place items weighing more than 20 pounds (9 kg) on top of a Vanguard
3400 Series enclosure.
Step Action
1 Unpack the Vanguard 3400 Series, and inspect the unit to ensure you have
all the components.
2 Install any daughterca
rds that you need to add to the unit, as
necessary.
3 Be sure that the four rubber feet a
re on the bottom of the enclosure.
4 Attach the power cord and cables to the rear panel. R
efer to the “Cabling
Your Vanguard 3400 Series” section on page 3-7 for cabling information.
Cable Adapters are required when installing the Vanguard 3400 Series into
an existing site that already has Vanguard Networks high-speed (V.11/
X.21, V.35, or V.36) Adapter Cables. (See
“Cable Adapters and Special
Cables” section on page 3-8)
5 Place the enclosure in the selected site, and
power unit on. Do not block
the chassis vents.
6 Ensure that the ambient temperature is within the temperature
range speci-
fied in Appendix A.
Comentários a estes Manuais